CONSTRUCTION OF FOUNDATION PILES

For Turco costruzioni s.r.l.

  • Construction of piles ø 600 mm and ø 800 mm at the Raffineria di Gela S.p.A. for the Claus TGC Plant Technological Adaptation;
  • Secant piles' bulkhead for the construction of a drainage basin at the dock basement area; 

  • For PEC S.p.A.
  • Construction of piles ø 600 mm for a Pet-coke storage and handling facility 

    For Raffineria di Gela
  • Construction of piles ø 600 mm, construction of new TGT plant

For  I.G.C. s.r.l.

  • Drilling with the use of bentonite mud and casting of the concrete with jet pipe for piles of ø 800 mm and ø 1200 mm for the consolidation of the S.S. Geremia II viaduct.

For  Enifin S.p.A.

  • Implementation of specialized drilling operations ø 2000 mm within the city of Catania for Enifin s.p.a..

Construction of piles img.1

Construction of piles img.2

Construction of piles img.3

Construction of piles img.4

Construction of piles img.5

Construction of piles img.6

 

Construction of piles img.7

 

Construction of piles img.8

Construction of piles img.9

Construction of piles img.10

Construction of piles img.11

Construction of piles img.12

Share by: